• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • IEEE - The Institute of Electrical and Electronics Engineers, Inc.
  • View Item
  •   YSE
  • Industrial Standards
  • IEEE - The Institute of Electrical and Electronics Engineers, Inc.
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

IEEE 400.3

IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment

Organization:
IEEE - The Institute of Electrical and Electronics Engineers, Inc.
Year: 2006

Abstract: This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using PD detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.
Purpose
This guide describes diagnostic methods capable of detecting and locating partial discharges from defects and damage in installed shielded power cable systems. The results of PD tests are used to assess the condition of cables and accessories.
URI: https://yse.yabesh.ir/std/handle/yse/107335
Subject: cable system testing
Collections :
  • IEEE - The Institute of Electrical and Electronics Engineers, Inc.
  • Download PDF : (518.0Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    IEEE 400.3

Show full item record

contributor authorIEEE - The Institute of Electrical and Electronics Engineers, Inc.
date accessioned2017-09-04T16:44:03Z
date available2017-09-04T16:44:03Z
date copyright09/15/2006
date issued2006
identifier otherBSRSXBAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/107335
description abstractThis guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using PD detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.
Purpose
This guide describes diagnostic methods capable of detecting and locating partial discharges from defects and damage in installed shielded power cable systems. The results of PD tests are used to assess the condition of cables and accessories.
languageEnglish
titleIEEE 400.3num
titleIEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environmenten
typestandard
page46
statusActive
treeIEEE - The Institute of Electrical and Electronics Engineers, Inc.:;2006
contenttypefulltext
subject keywordscable system testing
subject keywordscable testing
subject keywordsdiagnostic testing
subject keywordsoff-line partial discharge testing
subject keywordson-line partial discharge testing
subject keywordspartial discharge testing
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian