Lessons Learned – Test Contingency Planning Should Consider Facility Power Interruptions (1996)

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:46:42Z
date available2017-09-04T16:46:42Z
date copyright02/19/1998
date issued1998
identifier otherWDCEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/109994
description abstractAbstract:
During a regional public service power outage, an unplanned facility power loss occurred during system level thermal-vacuum test of the Mars Global Surveyor. This resulted in a slight inflow of external unfiltered air into the propulsion system through its Ground Support Equipment (GSE) pressure control system -- a potential contamination concern. Test contingency plans and FMEAs for ground support equipment should consider responses to facility power interruptions. Test facilities should have devices to maintain a safe spacecraft environment in the event of a facility power loss.
languageEnglish
titleNASA-LLIS-0583num
titleLessons Learned – Test Contingency Planning Should Consider Facility Power Interruptions (1996)en
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1998
contenttypefulltext
subject keywordsEnergy
subject keywordsTest & Verification
subject keywordsTest Facility


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record