• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0583

Lessons Learned – Test Contingency Planning Should Consider Facility Power Interruptions (1996)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1998

Abstract: Abstract:
During a regional public service power outage, an unplanned facility power loss occurred during system level thermal-vacuum test of the Mars Global Surveyor. This resulted in a slight inflow of external unfiltered air into the propulsion system through its Ground Support Equipment (GSE) pressure control system -- a potential contamination concern. Test contingency plans and FMEAs for ground support equipment should consider responses to facility power interruptions. Test facilities should have devices to maintain a safe spacecraft environment in the event of a facility power loss.
URI: https://yse.yabesh.ir/std/handle/yse/109994
Subject: Energy
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (15.21Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0583

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:46:42Z
date available2017-09-04T16:46:42Z
date copyright02/19/1998
date issued1998
identifier otherWDCEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/109994
description abstractAbstract:
During a regional public service power outage, an unplanned facility power loss occurred during system level thermal-vacuum test of the Mars Global Surveyor. This resulted in a slight inflow of external unfiltered air into the propulsion system through its Ground Support Equipment (GSE) pressure control system -- a potential contamination concern. Test contingency plans and FMEAs for ground support equipment should consider responses to facility power interruptions. Test facilities should have devices to maintain a safe spacecraft environment in the event of a facility power loss.
languageEnglish
titleNASA-LLIS-0583num
titleLessons Learned – Test Contingency Planning Should Consider Facility Power Interruptions (1996)en
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1998
contenttypefulltext
subject keywordsEnergy
subject keywordsTest & Verification
subject keywordsTest Facility
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian