• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ACI 336.3R

Report on Design and Construction of Drilled Piers

Organization:
ACI - American Concrete Institute
Year: 2014

Abstract: This report is generally limited to piers of 30 in. (760 mm) or larger diameter, made by open or slurry stabilized construction methods. A 30 in. (760 mm) diameter boundary is an arbitrary size. Although smaller-diameter drilled piers have been designed and installed in accordance with this report, it is difficult to detect sidewall collapse. Refer to ACI 543R for concrete piles having diameters smaller than 30 in. (760 mm), piles installed by the use of hollow stem augers, or other pile types. Also beyond the scope of this report are rectangular columns on spread footings in deep excavations and foundations constructed without excavations by methods such as mortar intrusion or mixed-in-place.
Piers installed by tapping or ramming concrete or aggregate into an excavated shaft are beyond the scope of this report. Engineers and contractors have used the terms "caissons," "foundation piers," "bored piles," "drilled shafts," and "drilled piers" interchangeably. The term "drilled pier" is used in this report. A drilled pier with an enlarged base can be called a belled caisson, belled pier, or drilled and underreamed footing. Drilled pier foundations excavated and concreted with water or slurry in the hole have been called slurry shafts, piers installed by wet-hole methods, or piers installed by slurry displacement methods.
URI: https://yse.yabesh.ir/std/handle/yse/110969
Collections :
  • ACI - American Concrete Institute
  • Download PDF : (2.954Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ACI 336.3R

Show full item record

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T16:47:33Z
date available2017-09-04T16:47:33Z
date copyright2014.08.01
date issued2014
identifier otherWFRPIFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/110969
description abstractThis report is generally limited to piers of 30 in. (760 mm) or larger diameter, made by open or slurry stabilized construction methods. A 30 in. (760 mm) diameter boundary is an arbitrary size. Although smaller-diameter drilled piers have been designed and installed in accordance with this report, it is difficult to detect sidewall collapse. Refer to ACI 543R for concrete piles having diameters smaller than 30 in. (760 mm), piles installed by the use of hollow stem augers, or other pile types. Also beyond the scope of this report are rectangular columns on spread footings in deep excavations and foundations constructed without excavations by methods such as mortar intrusion or mixed-in-place.
Piers installed by tapping or ramming concrete or aggregate into an excavated shaft are beyond the scope of this report. Engineers and contractors have used the terms "caissons," "foundation piers," "bored piles," "drilled shafts," and "drilled piers" interchangeably. The term "drilled pier" is used in this report. A drilled pier with an enlarged base can be called a belled caisson, belled pier, or drilled and underreamed footing. Drilled pier foundations excavated and concreted with water or slurry in the hole have been called slurry shafts, piers installed by wet-hole methods, or piers installed by slurry displacement methods.
languageEnglish
titleACI 336.3Rnum
titleReport on Design and Construction of Drilled Piersen
typestandard
page34
statusActive
treeACI - American Concrete Institute:;2014
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian