• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1373

Lessons Learned – Construction Safety

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2002

Abstract: Description of Driving Event:
DFRC had a dozen large diameter (20"+/-) fire water sectional valves located in large vaults around the flight line. The requirement was to backfill these vaults with earthen materials, and remove the top of the vaults, and pave flush around them for minimal impact to the flight line area. The problems of doing this with "dirt" included working down in deep confined spaces, substandard compaction, hazards and probabilities of using power compactors around critical facility pressurized piping, and possible pipe damage resulting in flooding and drowning hazards.
The simple solution arrived at was to "pour" in pea gravel, that flowed in like water and achieved near-100% compaction.
URI: https://yse.yabesh.ir/std/handle/yse/11144
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.91Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1373

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:12:37Z
date available2017-09-04T15:12:37Z
date copyright01/28/2002
date issued2002
identifier otherLXVEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/11144
description abstractDescription of Driving Event:
DFRC had a dozen large diameter (20"+/-) fire water sectional valves located in large vaults around the flight line. The requirement was to backfill these vaults with earthen materials, and remove the top of the vaults, and pave flush around them for minimal impact to the flight line area. The problems of doing this with "dirt" included working down in deep confined spaces, substandard compaction, hazards and probabilities of using power compactors around critical facility pressurized piping, and possible pipe damage resulting in flooding and drowning hazards.
The simple solution arrived at was to "pour" in pea gravel, that flowed in like water and achieved near-100% compaction.
languageEnglish
titleNASA-LLIS-1373num
titleLessons Learned – Construction Safetyen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2002
contenttypefulltext
subject keywordsFacilities
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian