• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA NPR 8705.5 REV A

TECHNICAL PROBABILISTIC RISK ASSESSMENT (PRA) PROCEDURES FOR SAFETY AND MISSION SUCCESS FOR NASA PROGRAMS AND PROJECTS

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2010

Abstract: PURPOSE
This NASA Procedural Requirements (NPR) provides basic requirements for performing a probabilistic risk assessment (PRA) for NASA programs and projects. It addresses technical, mission success, safety, and health risk. It does not address programmatic risk involving consideration of cost and schedule.
APPLICABILITY
a. This NPR is applicable to NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers. This language applies to the Jet Propulsion Laboratory, other contractors, grant recipients, or parties to agreements to the extent specified or referenced in the appropriate contracts, grants, or agreements.
b. This NPR applies specifically to programs and projects that provide aerospace products or capabilities; i.e., space and aeronautics systems and launch, flight, and control systems that support the mission. The importance and scope (potential effects on public and worker health and safety, strategic significance, and cost) of the project/program being assessed is used to identify the extent of the PRA application.
c. This NPR does not apply to other types of programs and projects such as research and technology development and related test facilities, ground test infrastructure, training, or education; however, the PRA concepts and practices described within this document can be beneficial to other projects.
d. The applicability of this NPR to programs/projects already in progress depends on its criticality and life-cycle phase. Decisions concerning applicability to programs/projects in progress will be made on a case-by-case basis involving program/project manager recommendations to the governing program management council (PMC).
URI: https://yse.yabesh.ir/std/handle/yse/113253
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (194.5Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA NPR 8705.5 REV A

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:49:41Z
date available2017-09-04T16:49:41Z
date copyright06/07/2010
date issued2010
identifier otherWLWGSCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/113253
description abstractPURPOSE
This NASA Procedural Requirements (NPR) provides basic requirements for performing a probabilistic risk assessment (PRA) for NASA programs and projects. It addresses technical, mission success, safety, and health risk. It does not address programmatic risk involving consideration of cost and schedule.
APPLICABILITY
a. This NPR is applicable to NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers. This language applies to the Jet Propulsion Laboratory, other contractors, grant recipients, or parties to agreements to the extent specified or referenced in the appropriate contracts, grants, or agreements.
b. This NPR applies specifically to programs and projects that provide aerospace products or capabilities; i.e., space and aeronautics systems and launch, flight, and control systems that support the mission. The importance and scope (potential effects on public and worker health and safety, strategic significance, and cost) of the project/program being assessed is used to identify the extent of the PRA application.
c. This NPR does not apply to other types of programs and projects such as research and technology development and related test facilities, ground test infrastructure, training, or education; however, the PRA concepts and practices described within this document can be beneficial to other projects.
d. The applicability of this NPR to programs/projects already in progress depends on its criticality and life-cycle phase. Decisions concerning applicability to programs/projects in progress will be made on a case-by-case basis involving program/project manager recommendations to the governing program management council (PMC).
languageEnglish
titleNASA NPR 8705.5 REV Anum
titleTECHNICAL PROBABILISTIC RISK ASSESSMENT (PRA) PROCEDURES FOR SAFETY AND MISSION SUCCESS FOR NASA PROGRAMS AND PROJECTSen
typestandard
page25
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2010
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian