• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1518

Lessons Learned - Early Involvement of Mission Ops is a Key Success Facto

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2004

Abstract: Abstract:
Because the MER Flight Control Team (FCT) was fully formed only one month prior to MER launch, critical software engineering and operations management problems resulted. Staff FCT participation in project development at the beginning of Phase C and assure continued FCT involvement in project activities. Or at a minimum, select a few operations team members for early training.
URI: https://yse.yabesh.ir/std/handle/yse/115519
Subject: Deep Space Telemetry
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (15.45Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1518

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:51:56Z
date available2017-09-04T16:51:56Z
date copyright38292
date issued2004
identifier otherWRWEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/115519
description abstractAbstract:
Because the MER Flight Control Team (FCT) was fully formed only one month prior to MER launch, critical software engineering and operations management problems resulted. Staff FCT participation in project development at the beginning of Phase C and assure continued FCT involvement in project activities. Or at a minimum, select a few operations team members for early training.
languageEnglish
titleNASA-LLIS-1518num
titleLessons Learned - Early Involvement of Mission Ops is a Key Success Factoen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2004
contenttypefulltext
subject keywordsDeep Space Telemetry
subject keywordsFlight Operations
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHardware
subject keywordsProgram and Project Management
subject keywordsSafety & Mission Assurance
subject keywordsSoftware
subject keywordsSpacecraft
subject keywordsTest & Verification
subject keywordsTracking and Command System (TTC)
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian