• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-3757

Lessons Learned - Importance of Tracking and Verification of Space Flight Electrical Connectors During Ground Processing at Kennedy Space Cente

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: Description of Driving Event:
The Shuttle Connector Analysis Network (SCAN) system developed by the Space Shuttle Processing organization consisted of a user interface software and database system accessed by workstations throughout KSC to track an orbiter's connector configuration (mated or demated) and system retest verification. By using SCAN, the orbiter system engineers and test conductors could quickly determine the status of orbiter connector configurations. SCAN provided current listings of all demated connectors prior to system power-up. Often connector configurations would change between orbiter power-ups as a result of system troubleshooting or rework that could only be performed while the orbiter was powered down. SCAN also recorded the work authorization document that was used for performing the connector test verification after the mating of the flight hardware. The system engineer would record the system checkout for each active connector pin after the connector was mated for flight. The same process was followed if a connector was demated during ground processing (postflight mate). Ares I-X did not have a SCANtype system, and tracking of the connector configurations before power-up was difficult. There was also no good way to verify that connector testing had been performed on a flight-mated connector.
URI: https://yse.yabesh.ir/std/handle/yse/118042
Subject: Configuration Change Control
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (188.8Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-3757

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:54:31Z
date available2017-09-04T16:54:31Z
date copyright03/30/2011
date issued2011
identifier otherWYXKMEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/118042
description abstractDescription of Driving Event:
The Shuttle Connector Analysis Network (SCAN) system developed by the Space Shuttle Processing organization consisted of a user interface software and database system accessed by workstations throughout KSC to track an orbiter's connector configuration (mated or demated) and system retest verification. By using SCAN, the orbiter system engineers and test conductors could quickly determine the status of orbiter connector configurations. SCAN provided current listings of all demated connectors prior to system power-up. Often connector configurations would change between orbiter power-ups as a result of system troubleshooting or rework that could only be performed while the orbiter was powered down. SCAN also recorded the work authorization document that was used for performing the connector test verification after the mating of the flight hardware. The system engineer would record the system checkout for each active connector pin after the connector was mated for flight. The same process was followed if a connector was demated during ground processing (postflight mate). Ares I-X did not have a SCANtype system, and tracking of the connector configurations before power-up was difficult. There was also no good way to verify that connector testing had been performed on a flight-mated connector.
languageEnglish
titleNASA-LLIS-3757num
titleLessons Learned - Importance of Tracking and Verification of Space Flight Electrical Connectors During Ground Processing at Kennedy Space Centeen
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsConfiguration Change Control
subject keywordsConfiguration control and data management
subject keywordsConfiguration Management
subject keywordsGround Operations
subject keywordsPlanning of requirements verification processes
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian