• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1336

Lessons Learned - Verify Flight & GSE Cables Against Unit & System Schematics Prior to Test (1998)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2003

Abstract: Description of Driving Event:
During integration of the Genesis spacecraft, many flight and ground support equipment (GSE) cables were found to be electrically incompatible with spacecraft systems although they matched the cable wiring diagrams. Several times, testing had to be halted and the system analyzed for possible electrical overstress caused by power having been applied to the wrong pins. Eventually, spacecraft testing was stopped long enough to perform a pin-by-pin comparison of the cable wiring diagrams to the latest unit and system schematics. Once this was completed, errors were identified, the cables were reworked, and the problems were resolved.
The accuracy of cable wiring diagrams was a continuing problem on Genesis. Typically, cables are built by cable harness shops to the specifications provided by cable drawings and cable wiring diagrams. Cable design and fabrication may take place concurrently with the design of spacecraft black boxes. As a system design evolves and pin-out requirements change, there is a time lag before the interface control drawing (ICD) is updated and the changes flow back to the cable design and documentation. Should the cables be built to an outdated document, the first powering of a given spacecraft may cause major damage. Since the connectors still mate with their assigned receptacles, the electrical mismatches may not be apparent. Validating the cable harness configuration against unit and system schematics is a very time-consuming activity. If it is delayed until integration and test has already commenced, the task can impact the project schedule.
URI: https://yse.yabesh.ir/std/handle/yse/118730
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (15.02Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1336

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:55:16Z
date available2017-09-04T16:55:16Z
date copyright05/05/2003
date issued2003
identifier otherXAWEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/118730
description abstractDescription of Driving Event:
During integration of the Genesis spacecraft, many flight and ground support equipment (GSE) cables were found to be electrically incompatible with spacecraft systems although they matched the cable wiring diagrams. Several times, testing had to be halted and the system analyzed for possible electrical overstress caused by power having been applied to the wrong pins. Eventually, spacecraft testing was stopped long enough to perform a pin-by-pin comparison of the cable wiring diagrams to the latest unit and system schematics. Once this was completed, errors were identified, the cables were reworked, and the problems were resolved.
The accuracy of cable wiring diagrams was a continuing problem on Genesis. Typically, cables are built by cable harness shops to the specifications provided by cable drawings and cable wiring diagrams. Cable design and fabrication may take place concurrently with the design of spacecraft black boxes. As a system design evolves and pin-out requirements change, there is a time lag before the interface control drawing (ICD) is updated and the changes flow back to the cable design and documentation. Should the cables be built to an outdated document, the first powering of a given spacecraft may cause major damage. Since the connectors still mate with their assigned receptacles, the electrical mismatches may not be apparent. Validating the cable harness configuration against unit and system schematics is a very time-consuming activity. If it is delayed until integration and test has already commenced, the task can impact the project schedule.
languageEnglish
titleNASA-LLIS-1336num
titleLessons Learned - Verify Flight & GSE Cables Against Unit & System Schematics Prior to Test (1998)en
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2003
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsFlight Equipment
subject keywordsGround Equipment
subject keywordsHardware
subject keywordsPayloads
subject keywordsSpacecraft
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian