Abstract: Description of Driving Event:
The mobile crane was holding a 20 foot section of 36" diameter pipe while a section of handrail was being removed. Removal of the handrail was necessary in order to remove the section of pipe. While the crane was in operation, one of the crane's outriggers "leaked down", and caused a brief uncontrolled movement of the pipe. No damage occurred to the equipment, and property surrounding the crane. Most importantly, there were no injuries to personnel. The crane was not equipped with a "Positive Mechanical Block (PIN)" system. Subsequently, it was found that the crane had not been proof load tested for over a year.
The mobile crane was holding a 20 foot section of 36" diameter pipe while a section of handrail was being removed. Removal of the handrail was necessary in order to remove the section of pipe. While the crane was in operation, one of the crane's outriggers "leaked down", and caused a brief uncontrolled movement of the pipe. No damage occurred to the equipment, and property surrounding the crane. Most importantly, there were no injuries to personnel. The crane was not equipped with a "Positive Mechanical Block (PIN)" system. Subsequently, it was found that the crane had not been proof load tested for over a year.
Subject: Lifting Devices
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T16:55:20Z | |
| date available | 2017-09-04T16:55:20Z | |
| date copyright | 09/11/1997 | |
| date issued | 1997 | |
| identifier other | XBCEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/118815 | |
| description abstract | Description of Driving Event: The mobile crane was holding a 20 foot section of 36" diameter pipe while a section of handrail was being removed. Removal of the handrail was necessary in order to remove the section of pipe. While the crane was in operation, one of the crane's outriggers "leaked down", and caused a brief uncontrolled movement of the pipe. No damage occurred to the equipment, and property surrounding the crane. Most importantly, there were no injuries to personnel. The crane was not equipped with a "Positive Mechanical Block (PIN)" system. Subsequently, it was found that the crane had not been proof load tested for over a year. | |
| language | English | |
| title | NASA-LLIS-0565 | num |
| title | Lessons Learned – Mobile Crane/Preventive Maintenance | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1997 | |
| contenttype | fulltext | |
| subject keywords | Lifting Devices | |
| subject keywords | Logistics |