• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0565

Lessons Learned – Mobile Crane/Preventive Maintenance

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1997

Abstract: Description of Driving Event:
The mobile crane was holding a 20 foot section of 36" diameter pipe while a section of handrail was being removed. Removal of the handrail was necessary in order to remove the section of pipe. While the crane was in operation, one of the crane's outriggers "leaked down", and caused a brief uncontrolled movement of the pipe. No damage occurred to the equipment, and property surrounding the crane. Most importantly, there were no injuries to personnel. The crane was not equipped with a "Positive Mechanical Block (PIN)" system. Subsequently, it was found that the crane had not been proof load tested for over a year.
URI: https://yse.yabesh.ir/std/handle/yse/118815
Subject: Lifting Devices
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.28Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0565

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:55:20Z
date available2017-09-04T16:55:20Z
date copyright09/11/1997
date issued1997
identifier otherXBCEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/118815
description abstractDescription of Driving Event:
The mobile crane was holding a 20 foot section of 36" diameter pipe while a section of handrail was being removed. Removal of the handrail was necessary in order to remove the section of pipe. While the crane was in operation, one of the crane's outriggers "leaked down", and caused a brief uncontrolled movement of the pipe. No damage occurred to the equipment, and property surrounding the crane. Most importantly, there were no injuries to personnel. The crane was not equipped with a "Positive Mechanical Block (PIN)" system. Subsequently, it was found that the crane had not been proof load tested for over a year.
languageEnglish
titleNASA-LLIS-0565num
titleLessons Learned – Mobile Crane/Preventive Maintenanceen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1997
contenttypefulltext
subject keywordsLifting Devices
subject keywordsLogistics
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian