Abstract: Description of Driving Event:
During removal of the H2 tank from the OV-104 mid-body, a crane was used to take up the initial cable slack and transfer the load from the tank struts to the GSE lifting fixture. The move director called for a crane movement of "up at 1 in/sec" and the crane controller relayed the command to the crane operator. The actual lift rate was on the order of "up at 3 in/sec" and a momentary vertical load of 800 lbs was applied to the tank assembly. This load was immediately reduced and the tank bolts removed. The normal transfer load is made up of a 150 lb tank lifting fixture and a 235 lb tank weight.
During removal of the H2 tank from the OV-104 mid-body, a crane was used to take up the initial cable slack and transfer the load from the tank struts to the GSE lifting fixture. The move director called for a crane movement of "up at 1 in/sec" and the crane controller relayed the command to the crane operator. The actual lift rate was on the order of "up at 3 in/sec" and a momentary vertical load of 800 lbs was applied to the tank assembly. This load was immediately reduced and the tank bolts removed. The normal transfer load is made up of a 150 lb tank lifting fixture and a 235 lb tank weight.
Subject: Industrial Operations
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T16:55:52Z | |
| date available | 2017-09-04T16:55:52Z | |
| date copyright | 08/18/1992 | |
| date issued | 1992 | |
| identifier other | BVYCQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/119301 | |
| description abstract | Description of Driving Event: During removal of the H2 tank from the OV-104 mid-body, a crane was used to take up the initial cable slack and transfer the load from the tank struts to the GSE lifting fixture. The move director called for a crane movement of "up at 1 in/sec" and the crane controller relayed the command to the crane operator. The actual lift rate was on the order of "up at 3 in/sec" and a momentary vertical load of 800 lbs was applied to the tank assembly. This load was immediately reduced and the tank bolts removed. The normal transfer load is made up of a 150 lb tank lifting fixture and a 235 lb tank weight. | |
| language | English | |
| title | NASA-LLIS-0121 | num |
| title | Lessons Learned - Orbiter Vehicle (OV) Hydrogen (H2) Tank Removal | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1992 | |
| contenttype | fulltext | |
| subject keywords | Industrial Operations | |
| subject keywords | Lifting Devices | |
| subject keywords | Transportation |

درباره ما