• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0983

Lessons Learned – Fixed Price Spacecraft Contracting

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2000

Abstract: Description of Driving Event:
Procurement of a fixed price spacecraft was a cost effective strategy to reduce total mission cost. However, the impact of undefined interfaces at the start of the contract and the uncertainties related to government-furnished hardware, resulted in some costs, which could have been avoided. Additional cost savings could have been realized if the instrument design and other interfaces were in a more advanced state.
URI: https://yse.yabesh.ir/std/handle/yse/120189
Subject: Financial Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.28Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0983

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:56:42Z
date available2017-09-04T16:56:42Z
date copyright36817
date issued2000
identifier otherXEUEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/120189
description abstractDescription of Driving Event:
Procurement of a fixed price spacecraft was a cost effective strategy to reduce total mission cost. However, the impact of undefined interfaces at the start of the contract and the uncertainties related to government-furnished hardware, resulted in some costs, which could have been avoided. Additional cost savings could have been realized if the instrument design and other interfaces were in a more advanced state.
languageEnglish
titleNASA-LLIS-0983num
titleLessons Learned – Fixed Price Spacecraft Contractingen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext
subject keywordsFinancial Management
subject keywordsHardware
subject keywordsProcurement Small Business & Industrial Relations
subject keywordsResearch & Development
subject keywordsSpacecraft
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian