NASA-LLIS-0785
Lessons Learned – Assembly Acoustic Tests
Year: 2000
Abstract: Practice:
Subject selected (large surface area, low mass) assemblies, in addition to the full-up flight system, to acoustic noise. It is imperative on missions with fixed launch windows that acoustic problems on assemblies not be deferred to system level tests.
Subject selected (large surface area, low mass) assemblies, in addition to the full-up flight system, to acoustic noise. It is imperative on missions with fixed launch windows that acoustic problems on assemblies not be deferred to system level tests.
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:13:23Z | |
| date available | 2017-09-04T15:13:23Z | |
| date copyright | 04/14/2000 | |
| date issued | 2000 | |
| identifier other | MADEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/12083 | |
| description abstract | Practice: Subject selected (large surface area, low mass) assemblies, in addition to the full-up flight system, to acoustic noise. It is imperative on missions with fixed launch windows that acoustic problems on assemblies not be deferred to system level tests. | |
| language | English | |
| title | NASA-LLIS-0785 | num |
| title | Lessons Learned – Assembly Acoustic Tests | en |
| type | standard | |
| page | 3 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2000 | |
| contenttype | fulltext |

درباره ما