• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0209

Lessons Learned - Time Correlation Between Multiple Telemetry Systems

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
The Space Shuttle Main Engine (SSME) telemetry system does not show absolute Greenwich Mean Time (GMT), but rather, the number of controller cycles since change in mode. Approximate timing had been established (during the STS 51-L launch process) by aligning the first guidance cycle after engine start with the engine start command time determined by analysis of the General Purpose Computer (GPC) event times. This aligned the SSME event times to the GPC event times to within a few tens of milliseconds, sufficient for normal flight analysis but insufficient for determining event sequencing for a system failure, which involves an interaction between the SSME and the rest of the vehicle. Without precise correlation between multiple data systems, there may be a delay in subsequent anomaly investigations due to timing uncertainties or a need to correct data timing.
URI: https://yse.yabesh.ir/std/handle/yse/121747
Subject: Flight Equipment
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.02Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0209

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:58:23Z
date available2017-09-04T16:58:23Z
date copyright33921
date issued1992
identifier otherXIZCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/121747
description abstractDescription of Driving Event:
The Space Shuttle Main Engine (SSME) telemetry system does not show absolute Greenwich Mean Time (GMT), but rather, the number of controller cycles since change in mode. Approximate timing had been established (during the STS 51-L launch process) by aligning the first guidance cycle after engine start with the engine start command time determined by analysis of the General Purpose Computer (GPC) event times. This aligned the SSME event times to the GPC event times to within a few tens of milliseconds, sufficient for normal flight analysis but insufficient for determining event sequencing for a system failure, which involves an interaction between the SSME and the rest of the vehicle. Without precise correlation between multiple data systems, there may be a delay in subsequent anomaly investigations due to timing uncertainties or a need to correct data timing.
languageEnglish
titleNASA-LLIS-0209num
titleLessons Learned - Time Correlation Between Multiple Telemetry Systemsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFlight Equipment
subject keywordsFlight Operations
subject keywordsLaunch Vehicle
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian