Show simple item record

Lessons Learned - Control Valves

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:59:28Z
date available2017-09-04T16:59:28Z
date copyright07/08/1993
date issued1993
identifier otherXLZCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/122908
description abstractDescription of Driving Event:
A test Centaur 1-E tank, on standby, was damaged. The bulkhead between the liquid hydrogen tank and the liquid oxygen tank failed due to a series of events. Air services to the building were shut down for repairs so that the facility switched to an emergency nitrogen supply. Failure to switch back to service air when it became available, led to the mishap. The emergency supply became depleted and two valves in the normal nitrogen purge system failed in the open position releasing the high pressure nitrogen gas from the manifold into the liquid hydrogen tank. The gas flow raised the liquid hydrogen tank pressure to 4.5 psig. That was sufficient to rupture the bulkhead wall.
languageEnglish
titleNASA-LLIS-0237num
titleLessons Learned - Control Valvesen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1993
contenttypefulltext
subject keywordsPressure Vessels


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record