• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1713

Lessons Learned - Simulate the Launch Site RF Configuration During I&T

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2005

Abstract: Abstract:
Science data losses during compatibility testing at the CloudSat launch site were traced to an RF cabling configuration that differed from the cables, couplers, and attenuators used during I&T. Simulate the launch (or launch support) facility cabling configuration during I&T, and consider performing the actual launch control function from within the factory I&T facility as a standard practice.
URI: https://yse.yabesh.ir/std/handle/yse/123262
Subject: Additional Categories.
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (17.22Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1713

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:59:48Z
date available2017-09-04T16:59:48Z
date copyright38667
date issued2005
identifier otherXMXCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/123262
description abstractAbstract:
Science data losses during compatibility testing at the CloudSat launch site were traced to an RF cabling configuration that differed from the cables, couplers, and attenuators used during I&T. Simulate the launch (or launch support) facility cabling configuration during I&T, and consider performing the actual launch control function from within the factory I&T facility as a standard practice.
languageEnglish
titleNASA-LLIS-1713num
titleLessons Learned - Simulate the Launch Site RF Configuration During I&Ten
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2005
contenttypefulltext
subject keywordsAdditional Categories.
subject keywordsAdditional Categories.Communication Systems
subject keywordsAdditional Categories.Configuration Management
subject keywordsAdditional Categories.Facilities
subject keywordsAdditional Categories.Flight Equipment
subject keywordsAdditional Categories.Flight Operations
subject keywordsAdditional Categories.Ground Equipment
subject keywordsAdditional Categories.Ground Operations
subject keywordsAdditional Categories.Hardware
subject keywordsAdditional Categories.Launch Process
subject keywordsAdditional Categories.Payloads
subject keywordsAdditional Categories.Range Operations
subject keywordsAdditional Categories.Spacecraft
subject keywordsAdditional Categories.Test Article
subject keywordsAdditional Categories.Test Facility
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian