• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NAVY - SH - Naval Sea Systems Command (Ship Systems)
  • View Item
  •   YSE
  • Defence Standards
  • NAVY - SH - Naval Sea Systems Command (Ship Systems)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

MIL-STD-2003-1A

ELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (CABLE)

Organization:
NAVY - SH - Naval Sea Systems Command (Ship Systems)
Year: 2009

Abstract: This standard covers standard methods for cable preparation and end-sealing, entry to equipment and connectors, repair and splicing.
Application. These installation methods are to be used by all installing activities. These methods do not identify ship or type but do establish minimum standards of acceptance for Naval ships. It is the responsibility of the user activity to determine which method satisfies their requirements. It does not authorize relaxation of any requirement specifically invoked by new construction, conversion, overhaul, or refurbishment contracts. In instances where deviated design requirements (for example, ship type, ship class, and so forth) conflict with the requirements of this standard, the requirements of this standard govern. Any deviation for electric plant installation identified in this standard is to be submitted to NAVSEA 05Z3 for resolution.
New cable specifications. Refer to the cable comparison handbook (MIL-HDBK-299) for guidance in substituting MIL-DTL-24643 cable for equivalent MIL-DTL-915 cable applications. All cable type designations specified herein, to be in accordance with MIL-DTL-24643, are preceded by the prefix "LS".Intended Use: This section specifies the requirements for cable preparation and end-sealing, cable entry to equipment, cable entry to connectors, cable repair and cable splicing methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction, conversion, and alteration of existing ships.
URI: https://yse.yabesh.ir/std/handle/yse/124730
Subject: Connection preparation
Collections :
  • NAVY - SH - Naval Sea Systems Command (Ship Systems)
  • Download PDF : (2.062Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    MIL-STD-2003-1A

Show full item record

contributor authorNAVY - SH - Naval Sea Systems Command (Ship Systems)
date accessioned2017-09-04T17:01:12Z
date available2017-09-04T17:01:12Z
date copyright09/03/2009
date issued2009
identifier otherXQUIOCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/124730
description abstractThis standard covers standard methods for cable preparation and end-sealing, entry to equipment and connectors, repair and splicing.
Application. These installation methods are to be used by all installing activities. These methods do not identify ship or type but do establish minimum standards of acceptance for Naval ships. It is the responsibility of the user activity to determine which method satisfies their requirements. It does not authorize relaxation of any requirement specifically invoked by new construction, conversion, overhaul, or refurbishment contracts. In instances where deviated design requirements (for example, ship type, ship class, and so forth) conflict with the requirements of this standard, the requirements of this standard govern. Any deviation for electric plant installation identified in this standard is to be submitted to NAVSEA 05Z3 for resolution.
New cable specifications. Refer to the cable comparison handbook (MIL-HDBK-299) for guidance in substituting MIL-DTL-24643 cable for equivalent MIL-DTL-915 cable applications. All cable type designations specified herein, to be in accordance with MIL-DTL-24643, are preceded by the prefix "LS".Intended Use: This section specifies the requirements for cable preparation and end-sealing, cable entry to equipment, cable entry to connectors, cable repair and cable splicing methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction, conversion, and alteration of existing ships.
languageEnglish
titleMIL-STD-2003-1Anum
titleELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (CABLE)en
typestandard
page119
statusActive
treeNAVY - SH - Naval Sea Systems Command (Ship Systems):;2009
contenttypefulltext
subject keywordsConnection preparation
subject keywordsConnectors
subject keywordsEnd-sealing
subject keywordsEquipment entry
subject keywordsSplicing
subject keywordsWater blocked
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian