• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0475

Lessons Learned - Fit Check of Flight Hardware

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1993

Abstract: Description of Driving Event:
During ground operations at KSC, the first United States Microgravity Laboratory (USML-1) experienced canister fit problems with the LiOH flight storage containers. This resulted in significant overtime and nearly caused delay of the orbiter move to the Vehicle Assembly Building (VAB). The cause of the problem was that a fit check of the canisters in container foam was not done in the flight configuration at Huntsville, Alabama.
URI: https://yse.yabesh.ir/std/handle/yse/125193
Subject: Ground Operations
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.74Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0475

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:01:40Z
date available2017-09-04T17:01:40Z
date copyright34281
date issued1993
identifier otherXSBEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/125193
description abstractDescription of Driving Event:
During ground operations at KSC, the first United States Microgravity Laboratory (USML-1) experienced canister fit problems with the LiOH flight storage containers. This resulted in significant overtime and nearly caused delay of the orbiter move to the Vehicle Assembly Building (VAB). The cause of the problem was that a fit check of the canisters in container foam was not done in the flight configuration at Huntsville, Alabama.
languageEnglish
titleNASA-LLIS-0475num
titleLessons Learned - Fit Check of Flight Hardwareen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1993
contenttypefulltext
subject keywordsGround Operations
subject keywordsHardware
subject keywordsTest & Verification
subject keywordsTransportation
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian