• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-4584

Lessons Learned - Establishing a Configuration Status Accounting (CSA) Tool

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: In the Constellation Program (CxP), the consideration for utilizing a Configuration Status Accounting (CSA) tool was not taken into account during the early parts of the program development cycle. This resulted in Projects under CxP performing CSA using a manual process that was subject to errors and resulted in inaccurate data reporting. The CSA tool should be in place early in the lifecycle (by the requirement development/approval phase) so as to ensure traceability from the approval of the requirements through implementation and operations of the final product.
URI: https://yse.yabesh.ir/std/handle/yse/126066
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (59.33Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-4584

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:02:31Z
date available2017-09-04T17:02:31Z
date copyright41215
date issued2012
identifier otherXUKZAFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/126066
description abstractIn the Constellation Program (CxP), the consideration for utilizing a Configuration Status Accounting (CSA) tool was not taken into account during the early parts of the program development cycle. This resulted in Projects under CxP performing CSA using a manual process that was subject to errors and resulted in inaccurate data reporting. The CSA tool should be in place early in the lifecycle (by the requirement development/approval phase) so as to ensure traceability from the approval of the requirements through implementation and operations of the final product.
languageEnglish
titleNASA-LLIS-4584num
titleLessons Learned - Establishing a Configuration Status Accounting (CSA) Toolen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian