NASA-LLIS-0897
Lessons Learned – Approval Process for Launch Vehicle (LV)/Spacecraft (SC) Interface Control Document (ICD) Changes
Year: 2000
Abstract: Description of Driving Event:
Changes to an approved LV/SC ICD are submitted via an Interface Revision Notice (IRN) document. The existing formal approval process requires the signatures of NASA-GSFC (SC), NASA-KSC (LV), and the LV contractor on all IRN submittals. Noticeably absent from the formal process is the SC contractor. NASA-GSFC and the SC contractor have an informal agreement whereby the change is reviewed and concurrence is documented via e-mail correspondence. During the GOES-L "Red Team" review process the omission of the SC contractor in the formal review/ approval process raised the question of legal/liability issues.
Changes to an approved LV/SC ICD are submitted via an Interface Revision Notice (IRN) document. The existing formal approval process requires the signatures of NASA-GSFC (SC), NASA-KSC (LV), and the LV contractor on all IRN submittals. Noticeably absent from the formal process is the SC contractor. NASA-GSFC and the SC contractor have an informal agreement whereby the change is reviewed and concurrence is documented via e-mail correspondence. During the GOES-L "Red Team" review process the omission of the SC contractor in the formal review/ approval process raised the question of legal/liability issues.
Subject: Configuration Management
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T17:02:58Z | |
| date available | 2017-09-04T17:02:58Z | |
| date copyright | 07/25/2000 | |
| date issued | 2000 | |
| identifier other | XVTEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/126521 | |
| description abstract | Description of Driving Event: Changes to an approved LV/SC ICD are submitted via an Interface Revision Notice (IRN) document. The existing formal approval process requires the signatures of NASA-GSFC (SC), NASA-KSC (LV), and the LV contractor on all IRN submittals. Noticeably absent from the formal process is the SC contractor. NASA-GSFC and the SC contractor have an informal agreement whereby the change is reviewed and concurrence is documented via e-mail correspondence. During the GOES-L "Red Team" review process the omission of the SC contractor in the formal review/ approval process raised the question of legal/liability issues. | |
| language | English | |
| title | NASA-LLIS-0897 | num |
| title | Lessons Learned – Approval Process for Launch Vehicle (LV)/Spacecraft (SC) Interface Control Document (ICD) Changes | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2000 | |
| contenttype | fulltext | |
| subject keywords | Configuration Management | |
| subject keywords | Launch Vehicle | |
| subject keywords | Spacecraft |