NASA-LLIS-1368
Lessons Learned – Implementation and Verification of Lockout/Tagout Procedures
Year: 2002
Abstract: Abstract:
An employee received an electrical injury after coming in contact with an energized electrical circuit while wiring a relocated emergency generator; the employee subsequently died of the injury. The subsequent investigation revealed three central themes involved in the mishap:
1. Implementation and Verification of Lockout / Tagout Procedures (the subject of this lesson),
2. Accurate Drawings of Facility Systems as a Prerequisite to Project Implementation, and
3. Demand and Ensure High-Quality Safety Performance from all Contractors.
Each theme is published as a separate lesson. (A fourth lesson underscores the successful implementation of the preliminary investigation, which was critical to performing a successful, formal mishap investigation.)
An employee received an electrical injury after coming in contact with an energized electrical circuit while wiring a relocated emergency generator; the employee subsequently died of the injury. The subsequent investigation revealed three central themes involved in the mishap:
1. Implementation and Verification of Lockout / Tagout Procedures (the subject of this lesson),
2. Accurate Drawings of Facility Systems as a Prerequisite to Project Implementation, and
3. Demand and Ensure High-Quality Safety Performance from all Contractors.
Each theme is published as a separate lesson. (A fourth lesson underscores the successful implementation of the preliminary investigation, which was critical to performing a successful, formal mishap investigation.)
Subject: Energy
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:13:59Z | |
| date available | 2017-09-04T15:13:59Z | |
| date copyright | 08/29/2002 | |
| date issued | 2002 | |
| identifier other | MBWEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/12701 | |
| description abstract | Abstract: An employee received an electrical injury after coming in contact with an energized electrical circuit while wiring a relocated emergency generator; the employee subsequently died of the injury. The subsequent investigation revealed three central themes involved in the mishap: 1. Implementation and Verification of Lockout / Tagout Procedures (the subject of this lesson), 2. Accurate Drawings of Facility Systems as a Prerequisite to Project Implementation, and 3. Demand and Ensure High-Quality Safety Performance from all Contractors. Each theme is published as a separate lesson. (A fourth lesson underscores the successful implementation of the preliminary investigation, which was critical to performing a successful, formal mishap investigation.) | |
| language | English | |
| title | NASA-LLIS-1368 | num |
| title | Lessons Learned – Implementation and Verification of Lockout/Tagout Procedures | en |
| type | standard | |
| page | 4 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2002 | |
| contenttype | fulltext | |
| subject keywords | Energy | |
| subject keywords | Facilities | |
| subject keywords | Human Factors | |
| subject keywords | Human Resources & Education | |
| subject keywords | Independent Verification and Validation | |
| subject keywords | Industrial Operations | |
| subject keywords | Personal Protective Equipment | |
| subject keywords | Policy & Planning | |
| subject keywords | Procurement Small Business & Industrial Relations | |
| subject keywords | Program and Project Management | |
| subject keywords | Risk Management/Assessment | |
| subject keywords | Safety & Mission Assurance | |
| subject keywords | Test & Verification |

درباره ما