• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-6796

Lessons Learned – TRaiNED Deployment Failure Was Traced to Design Flaws and Process Escapes [Export Version]

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: Description of Driving Event:
The Terrain-Relative Navigation and Employee Development (TRaiNED) project was a Class D (i.e., low cost, high risk) mission employing a sounding rocket to capture exoatmospheric and low-altitude imagery. Using the imagery to refine navigation algorithms, the payload developed by the NASA/Caltech Jet Propulsion Laboratory (JPL) for the 41.087 mission (Dr. Martin Heyne, Principal Investigator) was intended to advance the technology for autonomous terrain-relative navigation and hazard detection, providing aerial and surface access to key sites in the solar system.
The launch of the 41.087/Heyne Terrier-Improved Orion sounding rocket (Figure 1) from White Sands Missile Range (WSMR) on December 6, 2010 was nominal, but no data was received from the JPL-furnished cameras located in the exoatmospheric section. The camera field of view was blocked by a blow-off door, which did not release early in the flight as planned. The sounding rocket for the "Heyne" mission employed a legacy design in which the door (Figure 2) is held in place by tabs and by a single brass screw that is severed in flight by a pyrotechnic guillotine cutter. Rotational acceleration forces then act on the released door, which rotates away from the payload.
Review of telemetry records, inspection of the remaining door hardware, and material analysis, established that the blowoff door release (Figure 3) was actuated at the proper time in flight, but the deployment screw was only partially severed by the cutter (Reference (1)). A more common industry practice is to use high strength fasteners with an extremely high pre-load, so that the cutter only need weaken the screw to the point that the tensile load induces failure in the remainder of the material.
Although the Heyne mission failed to capture camera imagery at 120 km altitude from its exoatmospheric experiment section, the JPL payload did succeed in capturing the requisite descent imagery.
URI: https://yse.yabesh.ir/std/handle/yse/129074
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (315.2Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-6796

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:05:29Z
date available2017-09-04T17:05:29Z
date copyright41241
date issued2012
identifier otherYCQKFFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/129074
description abstractDescription of Driving Event:
The Terrain-Relative Navigation and Employee Development (TRaiNED) project was a Class D (i.e., low cost, high risk) mission employing a sounding rocket to capture exoatmospheric and low-altitude imagery. Using the imagery to refine navigation algorithms, the payload developed by the NASA/Caltech Jet Propulsion Laboratory (JPL) for the 41.087 mission (Dr. Martin Heyne, Principal Investigator) was intended to advance the technology for autonomous terrain-relative navigation and hazard detection, providing aerial and surface access to key sites in the solar system.
The launch of the 41.087/Heyne Terrier-Improved Orion sounding rocket (Figure 1) from White Sands Missile Range (WSMR) on December 6, 2010 was nominal, but no data was received from the JPL-furnished cameras located in the exoatmospheric section. The camera field of view was blocked by a blow-off door, which did not release early in the flight as planned. The sounding rocket for the "Heyne" mission employed a legacy design in which the door (Figure 2) is held in place by tabs and by a single brass screw that is severed in flight by a pyrotechnic guillotine cutter. Rotational acceleration forces then act on the released door, which rotates away from the payload.
Review of telemetry records, inspection of the remaining door hardware, and material analysis, established that the blowoff door release (Figure 3) was actuated at the proper time in flight, but the deployment screw was only partially severed by the cutter (Reference (1)). A more common industry practice is to use high strength fasteners with an extremely high pre-load, so that the cutter only need weaken the screw to the point that the tensile load induces failure in the remainder of the material.
Although the Heyne mission failed to capture camera imagery at 120 km altitude from its exoatmospheric experiment section, the JPL payload did succeed in capturing the requisite descent imagery.
languageEnglish
titleNASA-LLIS-6796num
titleLessons Learned – TRaiNED Deployment Failure Was Traced to Design Flaws and Process Escapes [Export Version]en
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian