• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-3756

Lessons Learned - Vendor Drawings and Training for Line-Replaceable Units (LRUs)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: Description of Driving Event:
Troubleshooting LRUs in space launch vehicles was time-consuming throughout the Space Shuttle program. Without knowledge of the internal operations of the LRUs, this process took longer than necessary, particularly when vendors were located in different time zones.
URI: https://yse.yabesh.ir/std/handle/yse/130201
Subject: Engineering design and project processes and standards
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (60.72Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-3756

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:06:37Z
date available2017-09-04T17:06:37Z
date copyright04/29/2011
date issued2011
identifier otherBYXKMEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/130201
description abstractDescription of Driving Event:
Troubleshooting LRUs in space launch vehicles was time-consuming throughout the Space Shuttle program. Without knowledge of the internal operations of the LRUs, this process took longer than necessary, particularly when vendors were located in different time zones.
languageEnglish
titleNASA-LLIS-3756num
titleLessons Learned - Vendor Drawings and Training for Line-Replaceable Units (LRUs)en
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsEngineering design and project processes and standards
subject keywordsGround Operations
subject keywordsGround processing and manifesting
subject keywordsHuman Resources & Education
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian