NASA-LLIS-3756
Lessons Learned - Vendor Drawings and Training for Line-Replaceable Units (LRUs)
Year: 2011
Abstract: Description of Driving Event:
Troubleshooting LRUs in space launch vehicles was time-consuming throughout the Space Shuttle program. Without knowledge of the internal operations of the LRUs, this process took longer than necessary, particularly when vendors were located in different time zones.
Troubleshooting LRUs in space launch vehicles was time-consuming throughout the Space Shuttle program. Without knowledge of the internal operations of the LRUs, this process took longer than necessary, particularly when vendors were located in different time zones.
Subject: Engineering design and project processes and standards
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T17:06:37Z | |
| date available | 2017-09-04T17:06:37Z | |
| date copyright | 04/29/2011 | |
| date issued | 2011 | |
| identifier other | BYXKMEAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/130201 | |
| description abstract | Description of Driving Event: Troubleshooting LRUs in space launch vehicles was time-consuming throughout the Space Shuttle program. Without knowledge of the internal operations of the LRUs, this process took longer than necessary, particularly when vendors were located in different time zones. | |
| language | English | |
| title | NASA-LLIS-3756 | num |
| title | Lessons Learned - Vendor Drawings and Training for Line-Replaceable Units (LRUs) | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2011 | |
| contenttype | fulltext | |
| subject keywords | Engineering design and project processes and standards | |
| subject keywords | Ground Operations | |
| subject keywords | Ground processing and manifesting | |
| subject keywords | Human Resources & Education |

درباره ما