• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-6216

Lessons Learned - MSL Mobility Assembly Lift Mishap

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: JPL flight hardware was damaged during a lift operation preceding a test of the MSL rover Mobility Assembly due to an undetected mechanical interference that was signaled by an anomalous load cell reading. The load cell reading expected during the lift should be documented and communicated in pre-lift briefings, and the readings should be monitored continuously during the lift. Cognizant engineers responsible for flight hardware lifts should receive intensive training in lift operations.
URI: https://yse.yabesh.ir/std/handle/yse/130865
Subject: Additional Categories.Flight Equipment
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (318.0Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-6216

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:07:22Z
date available2017-09-04T17:07:22Z
date copyright40854
date issued2011
identifier otherYHLHOEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/130865
description abstractJPL flight hardware was damaged during a lift operation preceding a test of the MSL rover Mobility Assembly due to an undetected mechanical interference that was signaled by an anomalous load cell reading. The load cell reading expected during the lift should be documented and communicated in pre-lift briefings, and the readings should be monitored continuously during the lift. Cognizant engineers responsible for flight hardware lifts should receive intensive training in lift operations.
languageEnglish
titleNASA-LLIS-6216num
titleLessons Learned - MSL Mobility Assembly Lift Mishapen
typestandard
page5
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsAdditional Categories.Flight Equipment
subject keywordsAdditional Categories.Ground Equipment
subject keywordsAdditional Categories.Hardware
subject keywordsAdditional Categories.Lifting Devices
subject keywordsAdditional Categories.Payloads
subject keywordsAdditional Categories.Safety & Mission Assurance
subject keywordsAdditional Categories.Spacecraft
subject keywordsAdditional Categories.Test & Verification
subject keywordsAdditional Categories.Test Article
subject keywordsAdditional Categories.Test Facility
subject keywordsIntegration and Testing
subject keywordsSafety and Mission Assurance.Advanced planning of safety systems
subject keywordsSystems Engineering and Analysis.Human factors planning
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian