• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0081

Lessons Learned - Ground Wire Connections

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
A General Contractor, was in the process of installing a hydraulic elevator at the centaur payload operations control center, (CPOCC) Phase I, Cape Canaveral Air Force Station, when a technician was electrocuted. The electrocution was caused by the victim's own failure to follow safe grounding procedures. For some unknown reason the victim failed to connect the ground wire in the machine room controller. The victim was familiar and educated to the proper safety precautions.
URI: https://yse.yabesh.ir/std/handle/yse/131413
Subject: Energy
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.80Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0081

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:07:51Z
date available2017-09-04T17:07:51Z
date copyright06/01/1992
date issued1992
identifier otherYIYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/131413
description abstractDescription of Driving Event:
A General Contractor, was in the process of installing a hydraulic elevator at the centaur payload operations control center, (CPOCC) Phase I, Cape Canaveral Air Force Station, when a technician was electrocuted. The electrocution was caused by the victim's own failure to follow safe grounding procedures. For some unknown reason the victim failed to connect the ground wire in the machine room controller. The victim was familiar and educated to the proper safety precautions.
languageEnglish
titleNASA-LLIS-0081num
titleLessons Learned - Ground Wire Connectionsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsEnergy
subject keywordsFacilities
subject keywordsHardware
subject keywordsSafety & Mission Assurance
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian