• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1243

Lessons Learned - Orbiter project is currently working to reduce the number of outstanding drawing changes. The project is prioritizing the drawing updates based on criticality, complexity, and traffic. The highest priority tile drawings have been completed and other subsystems will follow.

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2002

Abstract: Description of Driving Event:
Orbiter logistics supportability challenges due to parts obsolescence, business closures, etc.
URI: https://yse.yabesh.ir/std/handle/yse/131747
Subject: Aerospace Safety Advisory Panel
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.10Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1243

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:08:12Z
date available2017-09-04T17:08:12Z
date copyright06/17/2002
date issued2002
identifier otherYJVEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/131747
description abstractDescription of Driving Event:
Orbiter logistics supportability challenges due to parts obsolescence, business closures, etc.
languageEnglish
titleNASA-LLIS-1243num
titleLessons Learned - Orbiter project is currently working to reduce the number of outstanding drawing changes. The project is prioritizing the drawing updates based on criticality, complexity, and traffic. The highest priority tile drawings have been completed and other subsystems will follow.en
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2002
contenttypefulltext
subject keywordsAerospace Safety Advisory Panel
subject keywordsLogistics
subject keywordsRisk Management/Assessment
subject keywordsSpacecraft
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian