NASA-LLIS-1398
Lessons Learned – SWIFT Power Control Board Harness Wire Reversal
Year: 2004
Abstract: Abstract:
Serious damage to an instrument's heater control electronics resulted from incorrect wiring within the interface harness. Efforts to expedite the I&T schedule, incomplete documentation and reduced QA involvement were identified as contributing factors; however, risks were expected to be mitigated by the Safe-to-Mate procedure, which was expected to verify compliance with the ICD. These "time saving" decisions and acceptance of excess risk resulted not only in damage to the instrument but also a 4-month schedule delay.
Serious damage to an instrument's heater control electronics resulted from incorrect wiring within the interface harness. Efforts to expedite the I&T schedule, incomplete documentation and reduced QA involvement were identified as contributing factors; however, risks were expected to be mitigated by the Safe-to-Mate procedure, which was expected to verify compliance with the ICD. These "time saving" decisions and acceptance of excess risk resulted not only in damage to the instrument but also a 4-month schedule delay.
Subject: Administration/Organization
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T17:10:03Z | |
| date available | 2017-09-04T17:10:03Z | |
| date copyright | 01/02/2004 | |
| date issued | 2004 | |
| identifier other | BZVEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/133557 | |
| description abstract | Abstract: Serious damage to an instrument's heater control electronics resulted from incorrect wiring within the interface harness. Efforts to expedite the I&T schedule, incomplete documentation and reduced QA involvement were identified as contributing factors; however, risks were expected to be mitigated by the Safe-to-Mate procedure, which was expected to verify compliance with the ICD. These "time saving" decisions and acceptance of excess risk resulted not only in damage to the instrument but also a 4-month schedule delay. | |
| language | English | |
| title | NASA-LLIS-1398 | num |
| title | Lessons Learned – SWIFT Power Control Board Harness Wire Reversal | en |
| type | standard | |
| page | 4 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2004 | |
| contenttype | fulltext | |
| subject keywords | Administration/Organization | |
| subject keywords | Configuration Management | |
| subject keywords | Hardware | |
| subject keywords | Program and Project Management | |
| subject keywords | Risk Management/Assessment | |
| subject keywords | Safety & Mission Assurance | |
| subject keywords | Spacecraft | |
| subject keywords | Test & Verification |

درباره ما