• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0933

Lessons Learned - Failure occurred at the Transonic Dynamics Tunnel (TDT)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2001

Abstract: Description of Driving Event:
A failure occurred at the Transonic Dynamics Tunnel (TDT) when a blade separated from a rotor (i. e., an airplane propeller). The incident did not result in damage to the TDT, but significant damage occurred to the Wing and Rotor Aeroelastic Testing System (WRATS). This is a reusable testbed placed inside the TDT test section that allows for testing different rotor models. The rotor model being tested at the time was not NASA owned; it had been designed and manufactured by an industry customer.
A thorough investigation concluded that the most likely cause was using the wrong material to fabricate the cuffs of the rotor model. A cuff is the mechanism that attaches a blade to the rotor hub. The model designer specified aluminum 7075-T7351 as the cuff material, but the part was actually fabricated using aluminum 6061. The stress analysis performed prior to testing indicated that 7075 had the proper material properties for the cuff's intended ! task. However, an examination of the properties of 6061 showed that a cuff manufactured from 6061 was, "marginal at best for the task intended."
It was clear that the material change was not properly analyzed and that some of the people who needed to be informed about the change had not been informed. The customer stated after the incident, "that the material change was approved, but that information was not incorporated into the original [stress] analysis."
URI: https://yse.yabesh.ir/std/handle/yse/137532
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.37Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0933

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:14:07Z
date available2017-09-04T17:14:07Z
date copyright04/05/2001
date issued2001
identifier otherYZTEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/137532
description abstractDescription of Driving Event:
A failure occurred at the Transonic Dynamics Tunnel (TDT) when a blade separated from a rotor (i. e., an airplane propeller). The incident did not result in damage to the TDT, but significant damage occurred to the Wing and Rotor Aeroelastic Testing System (WRATS). This is a reusable testbed placed inside the TDT test section that allows for testing different rotor models. The rotor model being tested at the time was not NASA owned; it had been designed and manufactured by an industry customer.
A thorough investigation concluded that the most likely cause was using the wrong material to fabricate the cuffs of the rotor model. A cuff is the mechanism that attaches a blade to the rotor hub. The model designer specified aluminum 7075-T7351 as the cuff material, but the part was actually fabricated using aluminum 6061. The stress analysis performed prior to testing indicated that 7075 had the proper material properties for the cuff's intended ! task. However, an examination of the properties of 6061 showed that a cuff manufactured from 6061 was, "marginal at best for the task intended."
It was clear that the material change was not properly analyzed and that some of the people who needed to be informed about the change had not been informed. The customer stated after the incident, "that the material change was approved, but that information was not incorporated into the original [stress] analysis."
languageEnglish
titleNASA-LLIS-0933num
titleLessons Learned - Failure occurred at the Transonic Dynamics Tunnel (TDT)en
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2001
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsTest Facility
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian