Lessons Learned – Fire Protection System (FPS) Failure at the Launch Control Center (LCC)

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:15:48Z
date available2017-09-04T15:15:48Z
date copyright40819
date issued2011
identifier otherMHLHOEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/14876
description abstractAt approximately 9:00 p.m., on 28 January 2010, a six-inch diameter fire suppression (Firex) main supply pipe coupling separated from a pipe elbow releasing approximately 29,000 gallons of water into the Kennedy Space Center (KSC) Launch Control Center (LCC), Building K6-900, I.R.I.S. case number S-2010-029-00002. The water was released into the fourth-floor ‟R‟ stairwell, cascading down to all floors below. Much of the facility was flooded with the dirty, brackish water. System reviews should be conducted after major contract changes to ensure all required inspection and maintenance activities are scheduled in accordance with NASA, NFPA and manufacturer requirements.
languageEnglish
titleNASA-LLIS-5936num
titleLessons Learned – Fire Protection System (FPS) Failure at the Launch Control Center (LCC)en
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsAdditional Categories.Accident Investigation
subject keywordsAdditional Categories.Facilities
subject keywordsAdditional Categories.Fire Protection
subject keywordsSafety and Mission Assurance.Maintenance


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record