• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-5936

Lessons Learned – Fire Protection System (FPS) Failure at the Launch Control Center (LCC)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: At approximately 9:00 p.m., on 28 January 2010, a six-inch diameter fire suppression (Firex) main supply pipe coupling separated from a pipe elbow releasing approximately 29,000 gallons of water into the Kennedy Space Center (KSC) Launch Control Center (LCC), Building K6-900, I.R.I.S. case number S-2010-029-00002. The water was released into the fourth-floor ‟R‟ stairwell, cascading down to all floors below. Much of the facility was flooded with the dirty, brackish water. System reviews should be conducted after major contract changes to ensure all required inspection and maintenance activities are scheduled in accordance with NASA, NFPA and manufacturer requirements.
URI: https://yse.yabesh.ir/std/handle/yse/14876
Subject: Additional Categories.Accident Investigation
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (181.6Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-5936

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:15:48Z
date available2017-09-04T15:15:48Z
date copyright40819
date issued2011
identifier otherMHLHOEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/14876
description abstractAt approximately 9:00 p.m., on 28 January 2010, a six-inch diameter fire suppression (Firex) main supply pipe coupling separated from a pipe elbow releasing approximately 29,000 gallons of water into the Kennedy Space Center (KSC) Launch Control Center (LCC), Building K6-900, I.R.I.S. case number S-2010-029-00002. The water was released into the fourth-floor ‟R‟ stairwell, cascading down to all floors below. Much of the facility was flooded with the dirty, brackish water. System reviews should be conducted after major contract changes to ensure all required inspection and maintenance activities are scheduled in accordance with NASA, NFPA and manufacturer requirements.
languageEnglish
titleNASA-LLIS-5936num
titleLessons Learned – Fire Protection System (FPS) Failure at the Launch Control Center (LCC)en
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsAdditional Categories.Accident Investigation
subject keywordsAdditional Categories.Facilities
subject keywordsAdditional Categories.Fire Protection
subject keywordsSafety and Mission Assurance.Maintenance
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian