• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0636

Lessons Learned – Incorrectly Installed Fitting

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1999

Abstract: Description of Driving Event:
On 7/12/99, a mechanic was performing a verification leak test (using a 2900 psig gaseous nitrogen pressure source) of a 1/2" hand valve when an incorrect fitting blew out. The mechanic erroneously installed a 1/2" AN male fitting into the 1/2" NPT female port of the valve body. The fitting was attached to a high pressure flex hose when the failure occurred. This flex hose had Kellum restraints that prevented damage to equipment and injury to personnel.
URI: https://yse.yabesh.ir/std/handle/yse/15107
Subject: Energetic Materials - Explosive/Propellant/Pyrotechnic
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.03Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0636

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:15:58Z
date available2017-09-04T15:15:58Z
date copyright07/14/1999
date issued1999
identifier otherMICEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/15107
description abstractDescription of Driving Event:
On 7/12/99, a mechanic was performing a verification leak test (using a 2900 psig gaseous nitrogen pressure source) of a 1/2" hand valve when an incorrect fitting blew out. The mechanic erroneously installed a 1/2" AN male fitting into the 1/2" NPT female port of the valve body. The fitting was attached to a high pressure flex hose when the failure occurred. This flex hose had Kellum restraints that prevented damage to equipment and injury to personnel.
languageEnglish
titleNASA-LLIS-0636num
titleLessons Learned – Incorrectly Installed Fittingen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1999
contenttypefulltext
subject keywordsEnergetic Materials - Explosive/Propellant/Pyrotechnic
subject keywordsGround Equipment
subject keywordsPressure Vessels
subject keywordsTest & Verification
subject keywordsTest Facility
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian