• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1084

Lessons Learned - Mishap Investigation Board Report Findings for the GSFC Building 24 Pressurized Steam Line Close Call of August 19, 1999

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2000

Abstract: Abstract:
The primary cause of this Central Power Plant (CPP) pressurized steam line incident was that no one took responsibility for coordinating all aspects of executing the outage.
Recommendations included revising procedures, conducting an independent safety audit of the CPP, Developing as-built drawings for the CPP, and establishing "Locked And Tagged Out" processes and requirements.
URI: https://yse.yabesh.ir/std/handle/yse/15535
Subject: Communication Systems
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (25.04Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1084

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:16:18Z
date available2017-09-04T15:16:18Z
date copyright03/24/2000
date issued2000
identifier otherARUEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/15535
description abstractAbstract:
The primary cause of this Central Power Plant (CPP) pressurized steam line incident was that no one took responsibility for coordinating all aspects of executing the outage.
Recommendations included revising procedures, conducting an independent safety audit of the CPP, Developing as-built drawings for the CPP, and establishing "Locked And Tagged Out" processes and requirements.
languageEnglish
titleNASA-LLIS-1084num
titleLessons Learned - Mishap Investigation Board Report Findings for the GSFC Building 24 Pressurized Steam Line Close Call of August 19, 1999en
typestandard
page7
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext
subject keywordsCommunication Systems
subject keywordsFacilities
subject keywordsHuman Factors
subject keywordsIndustrial Operations
subject keywordsLogistics
subject keywordsMishap Reporting
subject keywordsOccupational Health
subject keywordsPackaging Handling Storage
subject keywordsPressure Vessels
subject keywordsSafety & Mission Assurance
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian