MIL-STD-2003-2A
ELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (EQUIPMENT)
Organization:
NAVY - SH - Naval Sea Systems Command (Ship Systems)
Year: 2009
Abstract: This standard covers standard installation methods for casualty power, shore power, electrical equipment, and switchboards.
Application. These installation methods are to be used by all installing activities. These methods do not identify ship or type, but do establish minimum standards of acceptance for Naval ships. It is the responsibility of the user activity to determine which method satisfies their requirements. It does not authorize relaxation of any requirement specifically invoked by new construction, conversion, overhaul, or refurbishment contracts. In instances where deviated design requirements (for example, ship type, ship class, and so forth) conflict with the requirements of this standard, the requirements of this standard govern. Any deviation for electric plant installation identified in this standard is to be submitted to NAVSEA 05Z3 for resolution.Intended Use: This section specifies the requirements for equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction, conversion, and alteration of existing ships.
Application. These installation methods are to be used by all installing activities. These methods do not identify ship or type, but do establish minimum standards of acceptance for Naval ships. It is the responsibility of the user activity to determine which method satisfies their requirements. It does not authorize relaxation of any requirement specifically invoked by new construction, conversion, overhaul, or refurbishment contracts. In instances where deviated design requirements (for example, ship type, ship class, and so forth) conflict with the requirements of this standard, the requirements of this standard govern. Any deviation for electric plant installation identified in this standard is to be submitted to NAVSEA 05Z3 for resolution.Intended Use: This section specifies the requirements for equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction, conversion, and alteration of existing ships.
Subject: Battery equipment
Collections
:
-
Statistics
MIL-STD-2003-2A
Show full item record
| contributor author | NAVY - SH - Naval Sea Systems Command (Ship Systems) | |
| date accessioned | 2017-09-04T15:16:21Z | |
| date available | 2017-09-04T15:16:21Z | |
| date copyright | 09/03/2009 | |
| date issued | 2009 | |
| identifier other | ARUIOCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/15602 | |
| description abstract | This standard covers standard installation methods for casualty power, shore power, electrical equipment, and switchboards. Application. These installation methods are to be used by all installing activities. These methods do not identify ship or type, but do establish minimum standards of acceptance for Naval ships. It is the responsibility of the user activity to determine which method satisfies their requirements. It does not authorize relaxation of any requirement specifically invoked by new construction, conversion, overhaul, or refurbishment contracts. In instances where deviated design requirements (for example, ship type, ship class, and so forth) conflict with the requirements of this standard, the requirements of this standard govern. Any deviation for electric plant installation identified in this standard is to be submitted to NAVSEA 05Z3 for resolution.Intended Use: This section specifies the requirements for equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction, conversion, and alteration of existing ships. | |
| language | English | |
| title | MIL-STD-2003-2A | num |
| title | ELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (EQUIPMENT) | en |
| type | standard | |
| page | 137 | |
| status | Active | |
| tree | NAVY - SH - Naval Sea Systems Command (Ship Systems):;2009 | |
| contenttype | fulltext | |
| subject keywords | Battery equipment | |
| subject keywords | Casualty power | |
| subject keywords | Shore power | |
| subject keywords | Switchboard mounting |