• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ASHRAE LV-11-C004

Rehab of DDC at Corporate National Training Center-Three Years of Therapy

Organization:
ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
Year: 2011

Abstract: Abstract
Environmental conditioning or HVAC contributes to many aspects of a ‘satisfactory worker environment'. One of the most significant aspects of a ‘satisfactory worker environment' is getting the Building Automation System (BAS) to correctly manage the system operations. In some ways, the BAS represents the brain and nervous system for the building body. And thus, careful attention is required when attempting rehabilitation or performing ‘brain surgery'.
When reviewing BAS systems in existing large buildings, it is important to evaluate the entire operation similar to the way a good doctor's plan includes a patient stress screening. Various operations can be tested in the Commissioning processes, including reviewing a listing of Hot-Cold calls and conducting a ‘laptop' survey at the sensors to reveal details of system performance similar to an EEG.
This Paper will present details of the rehabilitation of a BAS system at a pharmaceutical company's National Training Center campus. Built in New Jersey in the early 90s, the campus is comprised of three, five-story buildings, with approximately 240,000 total square feet (22300 SM). Each building includes a low temperature air supply system with Series Fan Powered VAV units. Following three years of effort in the continuously occupied buildings, the project is now complete and already shows much improved living conditions for the Owner.
The information of this paper is intended to convey the aspects of a detailed replacement of BAS using descriptions similar to those used by a Medical Professional to treat a patient. The Owner expressed a desire in and found greater value in the improved reliability of system operations even more than generating minor energy savings. While the improvement in maintenance staff's ability to maintain occupant's comfort could not easily be calculated, the Owner believed it represented a major financial benefit.
URI: https://yse.yabesh.ir/std/handle/yse/171559
Collections :
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • Download PDF : (2.349Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ASHRAE LV-11-C004

Show full item record

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2017-09-04T17:48:23Z
date available2017-09-04T17:48:23Z
date copyright01/01/2011
date issued2011
identifier otherEQXTKEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/171559
description abstractAbstract
Environmental conditioning or HVAC contributes to many aspects of a ‘satisfactory worker environment'. One of the most significant aspects of a ‘satisfactory worker environment' is getting the Building Automation System (BAS) to correctly manage the system operations. In some ways, the BAS represents the brain and nervous system for the building body. And thus, careful attention is required when attempting rehabilitation or performing ‘brain surgery'.
When reviewing BAS systems in existing large buildings, it is important to evaluate the entire operation similar to the way a good doctor's plan includes a patient stress screening. Various operations can be tested in the Commissioning processes, including reviewing a listing of Hot-Cold calls and conducting a ‘laptop' survey at the sensors to reveal details of system performance similar to an EEG.
This Paper will present details of the rehabilitation of a BAS system at a pharmaceutical company's National Training Center campus. Built in New Jersey in the early 90s, the campus is comprised of three, five-story buildings, with approximately 240,000 total square feet (22300 SM). Each building includes a low temperature air supply system with Series Fan Powered VAV units. Following three years of effort in the continuously occupied buildings, the project is now complete and already shows much improved living conditions for the Owner.
The information of this paper is intended to convey the aspects of a detailed replacement of BAS using descriptions similar to those used by a Medical Professional to treat a patient. The Owner expressed a desire in and found greater value in the improved reliability of system operations even more than generating minor energy savings. While the improvement in maintenance staff's ability to maintain occupant's comfort could not easily be calculated, the Owner believed it represented a major financial benefit.
languageEnglish
titleASHRAE LV-11-C004num
titleRehab of DDC at Corporate National Training Center-Three Years of Therapyen
typestandard
page8
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2011
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian