IEEE 336
Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities
Year: 2010
Abstract: This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing.
Purpose
The purpose of this recommended practice is to identify the activities, instructions, and attributes that should be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear facilities.
Purpose
The purpose of this recommended practice is to identify the activities, instructions, and attributes that should be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear facilities.
Subject: Class 1E
Show full item record
| contributor author | IEEE - The Institute of Electrical and Electronics Engineers, Inc. | |
| date accessioned | 2017-09-04T17:50:11Z | |
| date available | 2017-09-04T17:50:11Z | |
| date copyright | 06/17/2010 | |
| date issued | 2010 | |
| identifier other | EWCTADAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/173452 | |
| description abstract | This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing. Purpose The purpose of this recommended practice is to identify the activities, instructions, and attributes that should be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear facilities. | |
| language | English | |
| title | IEEE 336 | num |
| title | Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities | en |
| type | standard | |
| page | 25 | |
| status | Active | |
| tree | IEEE - The Institute of Electrical and Electronics Engineers, Inc.:;2010 | |
| contenttype | fulltext | |
| subject keywords | Class 1E | |
| subject keywords | configuration management | |
| subject keywords | constructability reviews | |
| subject keywords | functional testing | |
| subject keywords | inspection procedures | |
| subject keywords | multi-unit | |
| subject keywords | nuclear facilities | |
| subject keywords | plant design bases | |
| subject keywords | post-installation inspection | |
| subject keywords | post-maintenance test | |
| subject keywords | post-modification test | |
| subject keywords | pre-installation | |
| subject keywords | test plans | |
| subject keywords | test procedures |

درباره ما