UFC 3-230-11A
WATER SUPPLY FOR SPECIAL PROJECTS
contributor author | UFC - Unified Facilities Criteria | |
date accessioned | 2017-09-04T17:59:47Z | |
date available | 2017-09-04T17:59:47Z | |
date copyright | 01/16/2004 | |
date issued | 2004 | |
identifier other | FUYOJBAAAAAAAAAA.pdf | |
identifier uri | https://yse.yabesh.ir/std/handle/yse/182837 | |
description abstract | This manual prescribes the duration and rates of flow required for fire hydrant hose streams. It establishes criteria concerning the treatment of water, pumping, pneumatic pressure systems, and the location of fire hydrants. Many special projects and tactical sites have special water requirements that are not covered by referenced Technical Manuals. This manual covers water supply requirements for some of these sites; requirements for those not mentioned will be covered by special instructions from CDR USACE (DAEN-ECE-G), WASH DC 20314-1000, for Army projects; and HQ USAF/LEEE, WASH DC 20332, for Air Force projects. Purpose This manual establishes the minimum water supply requirements for fire protection and domestic purposes at various small military projects. It is intended to be used by all Army and Air Force personnel responsible for the planning and design of military construction. | |
language | English | |
title | UFC 3-230-11A | num |
title | WATER SUPPLY FOR SPECIAL PROJECTS | en |
type | standard | |
page | 12 | |
status | Active | |
tree | UFC - Unified Facilities Criteria:;2004 | |
contenttype | fulltext |