ASHRAE GUIDELINE 0 ADD A, B, C, D
The Commissioning Process
| contributor author | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. | |
| date accessioned | 2017-09-04T18:20:53Z | |
| date available | 2017-09-04T18:20:53Z | |
| date copyright | 01/23/2010 | |
| date issued | 2010 | |
| identifier other | HXKKQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/203361 | |
| description abstract | FOREWORD This addendum corrects an oversight in the current guideline in that Section 7.2.1.2 requires that a sampling approach be utilized for the Commissioning Process Tests, but it was not referenced in 7.2.9.1 or in 7.2.10.1. The added sentence in item "d" directs the user to include the sampling strategy. Note: In this addendum, changes to the current guideline are indicated in the text by underlining (for additions) and (for deletions) unless the instructions specifically mention some other means of indicating the changes. | |
| language | English | |
| title | ASHRAE GUIDELINE 0 ADD A, B, C, D | num |
| title | The Commissioning Process | en |
| type | standard | |
| page | 8 | |
| status | Active | |
| tree | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2010 | |
| contenttype | fulltext |

درباره ما