description abstractFOREWORD
This addendum corrects an oversight in the current guideline in that Section 7.2.1.2 requires that a sampling approach be utilized for the Commissioning Process Tests, but it was not referenced in 7.2.9.1 or in 7.2.10.1. The added sentence in item "d" directs the user to include the sampling strategy.
Note: In this addendum, changes to the current guideline are indicated in the text by underlining (for additions) and (for deletions) unless the instructions specifically mention some other means of indicating the changes.
languageEnglish
titleASHRAE GUIDELINE 0 ADD A, B, C, Dnum
titleThe Commissioning Processen
typestandard
page8
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2010
contenttypefulltext