• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ASHRAE GUIDELINE 0 ADD A, B, C, D

The Commissioning Process

Organization:
ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
Year: 2010

Abstract: FOREWORD
This addendum corrects an oversight in the current guideline in that Section 7.2.1.2 requires that a sampling approach be utilized for the Commissioning Process Tests, but it was not referenced in 7.2.9.1 or in 7.2.10.1. The added sentence in item "d" directs the user to include the sampling strategy.
Note: In this addendum, changes to the current guideline are indicated in the text by underlining (for additions) and (for deletions) unless the instructions specifically mention some other means of indicating the changes.
URI: https://yse.yabesh.ir/std/handle/yse/203361
Collections :
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • Download PDF : (443.2Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ASHRAE GUIDELINE 0 ADD A, B, C, D

Show full item record

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2017-09-04T18:20:53Z
date available2017-09-04T18:20:53Z
date copyright01/23/2010
date issued2010
identifier otherHXKKQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/203361
description abstractFOREWORD
This addendum corrects an oversight in the current guideline in that Section 7.2.1.2 requires that a sampling approach be utilized for the Commissioning Process Tests, but it was not referenced in 7.2.9.1 or in 7.2.10.1. The added sentence in item "d" directs the user to include the sampling strategy.
Note: In this addendum, changes to the current guideline are indicated in the text by underlining (for additions) and (for deletions) unless the instructions specifically mention some other means of indicating the changes.
languageEnglish
titleASHRAE GUIDELINE 0 ADD A, B, C, Dnum
titleThe Commissioning Processen
typestandard
page8
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2010
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian