• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

API RP 11S4

Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations - Third Edition

Organization:
API - American Petroleum Institute
Year: 2008

Abstract: Each component of the ESP system (pump, motor, intake, seal or protector, cable, switchboard, etc.) is discussed in some detail as far as what must be considered for the best selection at a desired rate and well conditions. Examples are given to illustrate the basic design procedure and illustrate how PVT correlations, multiphase flow correlations, and inflow performance relationships are used.
Summary designs and computer examples using the detailed design principles are presented which show how design considerations fit together, and how tools such as computer programs allow faster solutions resulting in easier trial and error calculations for optimization of designs and study of existing installations.
Topics such as PVT correlations, multiphase flow correlations, and inflow performance relationships are discussed in the appendices.
URI: https://yse.yabesh.ir/std/handle/yse/209953
Collections :
  • API - American Petroleum Institute
  • Download PDF : (445.2Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    API RP 11S4

Show full item record

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T18:27:44Z
date available2017-09-04T18:27:44Z
date copyright2002.07.01 (R 2008)
date issued2008
identifier otherIOWBGCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/209953
description abstractEach component of the ESP system (pump, motor, intake, seal or protector, cable, switchboard, etc.) is discussed in some detail as far as what must be considered for the best selection at a desired rate and well conditions. Examples are given to illustrate the basic design procedure and illustrate how PVT correlations, multiphase flow correlations, and inflow performance relationships are used.
Summary designs and computer examples using the detailed design principles are presented which show how design considerations fit together, and how tools such as computer programs allow faster solutions resulting in easier trial and error calculations for optimization of designs and study of existing installations.
Topics such as PVT correlations, multiphase flow correlations, and inflow performance relationships are discussed in the appendices.
languageEnglish
titleAPI RP 11S4num
titleRecommended Practice for Sizing and Selection of Electric Submersible Pump Installations - Third Editionen
typestandard
page44
statusActive
treeAPI - American Petroleum Institute:;2008
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian