• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • TIA - Telecommunications Industry Association
  • View Item
  •   YSE
  • Industrial Standards
  • TIA - Telecommunications Industry Association
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

TIA TIA-4945-A

Dynamic RAN Power Management Stage 1 Requirements

Organization:
TIA - Telecommunications Industry Association
Year: 2013

Abstract: This document provides the requirements for Dynamic RAN Power Management (DRPM). DRPM allows operators to control the power usage of RAN equipment dynamically. Such control includes powering off RAN equipment in times of low traffic, powering on RAN equipment in times of high traffic, consideration for emergency services, response to equipment failure, and scheduling of power management activities.
URI: https://yse.yabesh.ir/std/handle/yse/213907
Collections :
  • TIA - Telecommunications Industry Association
  • Download PDF : (443.8Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    TIA TIA-4945-A

Show full item record

contributor authorTIA - Telecommunications Industry Association
date accessioned2017-09-04T18:31:38Z
date available2017-09-04T18:31:38Z
date copyright04/01/2013
date issued2013
identifier otherAJFECFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/213907
description abstractThis document provides the requirements for Dynamic RAN Power Management (DRPM). DRPM allows operators to control the power usage of RAN equipment dynamically. Such control includes powering off RAN equipment in times of low traffic, powering on RAN equipment in times of high traffic, consideration for emergency services, response to equipment failure, and scheduling of power management activities.
languageEnglish
titleTIA TIA-4945-Anum
titleDynamic RAN Power Management Stage 1 Requirementsen
typestandard
page16
statusActive
treeTIA - Telecommunications Industry Association:;2013
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian