Lessons Learned – Mate/Demate, Verify, and Document Connectors One-at-a-Time (2003)

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:21:42Z
date available2017-09-04T15:21:42Z
date copyright08/08/2005
date issued2005
identifier otherMZXCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/21686
description abstractAbstract:
An integration and test failure was traced to an unmated flight connector that was registered as "mated" in the mate/demate log. The root cause was attributed to the failure of a technician/engineer to pause after each mate/ demate operation to enter it in the log, and to obtain QA verification. Flight connectors located in crowded or constrained areas (as well as those in more visible areas) must be mated or demated one-at-a-time under QA supervision, and accurate documentation of the connector status must be maintained.
languageEnglish
titleNASA-LLIS-1619num
titleLessons Learned – Mate/Demate, Verify, and Document Connectors One-at-a-Time (2003)en
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2005
contenttypefulltext
subject keywordsblind mate
subject keywordsconnector demating
subject keywordsconnector mating
subject keywordsFlight Equipment
subject keywordsGround Equipment
subject keywordsHardware
subject keywordsHuman Factors
subject keywordsIndependent Verification and Validation
subject keywordsIndustrial Operations
subject keywordsPayloads
subject keywordsQA procedure
subject keywordsSafety & Mission Assurance
subject keywordsTest & Verification
subject keywordsTest Article