Show simple item record

Lessons Learned - Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling System; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platforms

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:24:00Z
date available2017-09-04T15:24:00Z
date copyright02/20/1985
date issued1985
identifier otherNGYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/24349
description abstractDescription of Driving Event:
During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facility (OPF), a payload bay access platform fell from its stowed position, damaging the orbiter's left payload bay door and injuring a technician. The platform's hoisting cable was previously weakened when technicians used the platform system while it was tagout/lockout. The weakened cable continued to stretch and break, even though the technicians returned it to its stowed position.
languageEnglish
titleNASA-LLIS-0060num
titleLessons Learned - Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling System; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platformsen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1985
contenttypefulltext
subject keywordsFacilities
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHardware
subject keywordsHazardous/Toxic Waste/Materials
subject keywordsIndustrial Operations
subject keywordsSafety & Mission Assurance


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record