NASA-LLIS-0060
Lessons Learned - Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling System; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platforms
Year: 1985
Abstract: Description of Driving Event:
During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facility (OPF), a payload bay access platform fell from its stowed position, damaging the orbiter's left payload bay door and injuring a technician. The platform's hoisting cable was previously weakened when technicians used the platform system while it was tagout/lockout. The weakened cable continued to stretch and break, even though the technicians returned it to its stowed position.
During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facility (OPF), a payload bay access platform fell from its stowed position, damaging the orbiter's left payload bay door and injuring a technician. The platform's hoisting cable was previously weakened when technicians used the platform system while it was tagout/lockout. The weakened cable continued to stretch and break, even though the technicians returned it to its stowed position.
Subject: Facilities
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:24:00Z | |
| date available | 2017-09-04T15:24:00Z | |
| date copyright | 02/20/1985 | |
| date issued | 1985 | |
| identifier other | NGYCQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/24349 | |
| description abstract | Description of Driving Event: During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facility (OPF), a payload bay access platform fell from its stowed position, damaging the orbiter's left payload bay door and injuring a technician. The platform's hoisting cable was previously weakened when technicians used the platform system while it was tagout/lockout. The weakened cable continued to stretch and break, even though the technicians returned it to its stowed position. | |
| language | English | |
| title | NASA-LLIS-0060 | num |
| title | Lessons Learned - Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling System; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platforms | en |
| type | standard | |
| page | 3 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1985 | |
| contenttype | fulltext | |
| subject keywords | Facilities | |
| subject keywords | Ground Equipment | |
| subject keywords | Ground Operations | |
| subject keywords | Hardware | |
| subject keywords | Hazardous/Toxic Waste/Materials | |
| subject keywords | Industrial Operations | |
| subject keywords | Safety & Mission Assurance |

درباره ما