• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1996

Lessons Learned – MSL Heatshield Handling Incident

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2008

Abstract: Abstract:
In August 2008, the Mars Science Laboratory flight spare heatshield and fixture was dislodged from its tracks and fell 6-7 inches when being moved for a characterization test at a contractor facility. When ground handling flight hardware, even simple operations can fail without adequate procedures and training. Perform a fixture validation move prior to the first time flight hardware is to be moved, involve the designated cognizant engineer, and always use a steering stick or T-bar to guide the casters or wheels.
URI: https://yse.yabesh.ir/std/handle/yse/27829
Subject: 1.Advanced planning of safety systems
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (17.46Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1996

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:26:58Z
date available2017-09-04T15:26:58Z
date copyright39791
date issued2008
identifier otherNPYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/27829
description abstractAbstract:
In August 2008, the Mars Science Laboratory flight spare heatshield and fixture was dislodged from its tracks and fell 6-7 inches when being moved for a characterization test at a contractor facility. When ground handling flight hardware, even simple operations can fail without adequate procedures and training. Perform a fixture validation move prior to the first time flight hardware is to be moved, involve the designated cognizant engineer, and always use a steering stick or T-bar to guide the casters or wheels.
languageEnglish
titleNASA-LLIS-1996num
titleLessons Learned – MSL Heatshield Handling Incidenten
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2008
contenttypefulltext
subject keywords1.Advanced planning of safety systems
subject keywords1.Flight Equipment
subject keywords1.Ground Equipment
subject keywords1.Ground Operations
subject keywords1.Hardware
subject keywords1.Industrial Operations
subject keywords1.Payloads
subject keywords1.Product Assurance
subject keywords1.Quality
subject keywords1.Safety & Mission Assurance
subject keywords1.Spacecraft
subject keywords1.Test Article
subject keywords1.Test Facility
subject keywords1.Training Equipment
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian