Show simple item record

IEC 62271-209 (REDLINE + STANDARD)

contributor authorIEC - International Electrotechnical Commission
date accessioned2020-09-15T22:28:52Z
date available2020-09-15T22:28:52Z
date copyright2019.02.01
date issued2019
identifier otherDBXYGGAAAAAAAAAA.pdf
identifier otherDBXYGGAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/289127
description abstractScope: This part of IEC 62271 covers the connection assembly of fluid-filled and extruded cables to gas-insulated metal enclosed switchgear (GIS), in single- or three-phase arrangements where the cable terminations are fluid-filled or dry-type and there is a separating insulating barrier between the cable insulation and the gas insulation of the switchgear. The purpose of this document is to establish electrical and mechanical interchangeability between cable terminations and the gas-insulated metal-enclosed switchgear and to determine the limits of supply. It complements and amends, if applicable, the relevant IEC standards. For the purpose of this document the term "switchgear" is used for "gas-insulated metal enclosed switchgear". It does not cover directly immersed cable terminations, as described in CIGRE brochure 89 [4] 1. 1 Numbers in square brackets refer to the Bibliography.
titleEnglish -- High-voltage switchgear and controlgear – Part 209: Cable connections for gas-insulated metal-enclosed switchgear for rated voltages above 52 kV – Fluid-filled and extruded insulation cables – Fluidfilled and dry-type cable terminations - Edition 2.0en
titleIEC 62271-209 (REDLINE + STANDARD)num
typestandard
pageIEC
statusActive
treeIEC - International Electrotechnical Commission:;2019
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record