• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASTM - ASTM International
  • View Item
  •   YSE
  • Industrial Standards
  • ASTM - ASTM International
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

Standard Practice for Management of Low-Risk Property (LRP)

ASTM E2811-24

Organization:
ASTM - ASTM International
Year: 2024

Abstract: 4.1 LRP should be administratively controlled and managed using less resource-intensive methods than higher-risk property. 4.2 The type and scope of control and management should be commensurate with the level of risk. The entity shall determine the level of risk considering the following criteria: 4.2.1 Scarcity, 4.2.2 Technological obsolescence, 4.2.3 Lead time, 4.2.4 Standardization, 4.2.5 Criticality/expendability, 4.2.6 Sensitivity, 4.2.7 Threshold/monetary values, 4.2.8 Environmentally regulated, 4.2.9 National security/threat, 4.2.10 Schedule constraints, 4.2.11 Vulnerability, 4.2.12 Societal or personal safety, 4.2.13 Documented business agreements (for example: contract, grant, memorandum of agreement, plan), and 4.2.14 Initial accounting treatment. Note 1: The listing in 4.2.1 – 4.2.14 is not all-inclusive and may be supplemented by the entity and country. The management threshold/monetary value for item 4.2.7 in the United States and internationally may fluctuate up to $5000.00 or higher depending on agency and industry type. 4.3 The information received from conducting standard asset Life Cycle Processes (LCP) within each Life Cycle Stage (LCS) for LRP may not provide sufficient value to the entity that is equal to or greater than the cost associated with performing the processes. 4.4 Entities should establish policies and procedures, based on certain criteria in determining whether all or selected asset LCP should be conducted for LRP. 4.5 The success of any entity is dependent in part on its operational effectiveness. To be effective entities should shift their focus from risk avoidance to one of risk management. The required processes and associated cost to eliminate all risk is prohibitive and contrary to producing timely, high-quality, and competitive products and services. 4.6 While a variety of different strategies can mitigate or eliminate risk, the process for identifying risk includes: 4.6.1 Vulnerability of the asset, and 4.6.2 Consequence of a loss. 4.7 The process for managing the risk includes: 4.7.1 Reduction of risk, and 4.7.2 Prioritization of the risk management based on importance.
URI: https://yse.yabesh.ir/std/handle/yse/341379
Collections :
  • ASTM - ASTM International
  • Download PDF : (253.8Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    Standard Practice for Management of Low-Risk Property (LRP)

Show full item record

contributor authorASTM - ASTM International
date accessioned2025-09-30T18:01:15Z
date available2025-09-30T18:01:15Z
date copyright2024
date issued2024
identifier othere2811-24.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/341379
description abstract4.1 LRP should be administratively controlled and managed using less resource-intensive methods than higher-risk property. 4.2 The type and scope of control and management should be commensurate with the level of risk. The entity shall determine the level of risk considering the following criteria: 4.2.1 Scarcity, 4.2.2 Technological obsolescence, 4.2.3 Lead time, 4.2.4 Standardization, 4.2.5 Criticality/expendability, 4.2.6 Sensitivity, 4.2.7 Threshold/monetary values, 4.2.8 Environmentally regulated, 4.2.9 National security/threat, 4.2.10 Schedule constraints, 4.2.11 Vulnerability, 4.2.12 Societal or personal safety, 4.2.13 Documented business agreements (for example: contract, grant, memorandum of agreement, plan), and 4.2.14 Initial accounting treatment. Note 1: The listing in 4.2.1 – 4.2.14 is not all-inclusive and may be supplemented by the entity and country. The management threshold/monetary value for item 4.2.7 in the United States and internationally may fluctuate up to $5000.00 or higher depending on agency and industry type. 4.3 The information received from conducting standard asset Life Cycle Processes (LCP) within each Life Cycle Stage (LCS) for LRP may not provide sufficient value to the entity that is equal to or greater than the cost associated with performing the processes. 4.4 Entities should establish policies and procedures, based on certain criteria in determining whether all or selected asset LCP should be conducted for LRP. 4.5 The success of any entity is dependent in part on its operational effectiveness. To be effective entities should shift their focus from risk avoidance to one of risk management. The required processes and associated cost to eliminate all risk is prohibitive and contrary to producing timely, high-quality, and competitive products and services. 4.6 While a variety of different strategies can mitigate or eliminate risk, the process for identifying risk includes: 4.6.1 Vulnerability of the asset, and 4.6.2 Consequence of a loss. 4.7 The process for managing the risk includes: 4.7.1 Reduction of risk, and 4.7.2 Prioritization of the risk management based on importance.
languageEnglish
titleStandard Practice for Management of Low-Risk Property (LRP)en
titleASTM E2811-24num
typestandard
statusActive
treeASTM - ASTM International:;2024
contenttypefulltext
scope1.1 This practice covers the assessment of risk and management of low-risk property (LRP). 1.2 This practice is directed at tangible LRP. 1.3 This practice does not promote mismanagement or dereliction of duty to protect property, nor protecting property unreasonably—to the extent that usefulness is impaired. This practice recognizes the constraints of materiality and costs versus benefits in the control and management of property. 1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
identifier DOI10.1520/E2811-24
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian