• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

API RP 1172

Recommended Practice for Construction Parallel to Existing Underground Transmission Pipelines - FIRST EDITION

Organization:
API - American Petroleum Institute
Year: 2014

Abstract: Construction activities parallel to existing transmission pipelines, for any distance, are the focus of this recommended practice (RP). Activity of concern includes construction activity that could impact an existing facility, such as excavation or movement of equipment across the pipeline or within the easement that could affect the safe operation of the existing pipeline. This RP is intended as a resource to assist all parties to safely manage construction activities of new or modified facilities parallel to existing underground transmission pipelines.
Legislation and regulation related to excavation damage prevention varies by jurisdiction. For example, damage prevention regulations in Texas are different than in Louisiana. This RP shall not be construed as proposing deviation from any jurisdictional requirements. Likewise, nothing in this RP prevents the parties from agreeing to additional or more stringent measures, regardless of minimum regulatory expectations.
The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the constructing party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment, should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the "constructing party." These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.
URI: https://yse.yabesh.ir/std/handle/yse/35046
Collections :
  • API - American Petroleum Institute
  • Download PDF : (2.899Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    API RP 1172

Show full item record

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T15:33:25Z
date available2017-09-04T15:33:25Z
date copyright2014.04.01
date issued2014
identifier otherAXQSHFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/35046
description abstractConstruction activities parallel to existing transmission pipelines, for any distance, are the focus of this recommended practice (RP). Activity of concern includes construction activity that could impact an existing facility, such as excavation or movement of equipment across the pipeline or within the easement that could affect the safe operation of the existing pipeline. This RP is intended as a resource to assist all parties to safely manage construction activities of new or modified facilities parallel to existing underground transmission pipelines.
Legislation and regulation related to excavation damage prevention varies by jurisdiction. For example, damage prevention regulations in Texas are different than in Louisiana. This RP shall not be construed as proposing deviation from any jurisdictional requirements. Likewise, nothing in this RP prevents the parties from agreeing to additional or more stringent measures, regardless of minimum regulatory expectations.
The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the constructing party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment, should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the "constructing party." These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.
languageEnglish
titleAPI RP 1172num
titleRecommended Practice for Construction Parallel to Existing Underground Transmission Pipelines - FIRST EDITIONen
typestandard
page30
statusActive
treeAPI - American Petroleum Institute:;2014
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian