• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0482

Lessons Learned - Test Delays Due to Late Set-up of Instrument Ground Support Equipment (GSE)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1996

Abstract: Description of Driving Event:
During laboratory system level integration and testing for a GSFC satellite at a contractor's facility, testing was delayed or reordered because of problems with the Instrument GSE. The Instrument teams arrived the same day that the testing was to start, and when the GSE was hooked up, there were problems. The ensuing troubleshooting process caused delays in the start of testing. In some instances, the test procedure was reordered to workaround the problem.
URI: https://yse.yabesh.ir/std/handle/yse/37130
Subject: Administration/Organization
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.17Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0482

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:35:16Z
date available2017-09-04T15:35:16Z
date copyright35376
date issued1996
identifier otherOPBEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/37130
description abstractDescription of Driving Event:
During laboratory system level integration and testing for a GSFC satellite at a contractor's facility, testing was delayed or reordered because of problems with the Instrument GSE. The Instrument teams arrived the same day that the testing was to start, and when the GSE was hooked up, there were problems. The ensuing troubleshooting process caused delays in the start of testing. In some instances, the test procedure was reordered to workaround the problem.
languageEnglish
titleNASA-LLIS-0482num
titleLessons Learned - Test Delays Due to Late Set-up of Instrument Ground Support Equipment (GSE)en
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1996
contenttypefulltext
subject keywordsAdministration/Organization
subject keywordsPolicy & Planning
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian