NASA-LLIS-0482
Lessons Learned - Test Delays Due to Late Set-up of Instrument Ground Support Equipment (GSE)
Year: 1996
Abstract: Description of Driving Event:
During laboratory system level integration and testing for a GSFC satellite at a contractor's facility, testing was delayed or reordered because of problems with the Instrument GSE. The Instrument teams arrived the same day that the testing was to start, and when the GSE was hooked up, there were problems. The ensuing troubleshooting process caused delays in the start of testing. In some instances, the test procedure was reordered to workaround the problem.
During laboratory system level integration and testing for a GSFC satellite at a contractor's facility, testing was delayed or reordered because of problems with the Instrument GSE. The Instrument teams arrived the same day that the testing was to start, and when the GSE was hooked up, there were problems. The ensuing troubleshooting process caused delays in the start of testing. In some instances, the test procedure was reordered to workaround the problem.
Subject: Administration/Organization
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:35:16Z | |
| date available | 2017-09-04T15:35:16Z | |
| date copyright | 35376 | |
| date issued | 1996 | |
| identifier other | OPBEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/37130 | |
| description abstract | Description of Driving Event: During laboratory system level integration and testing for a GSFC satellite at a contractor's facility, testing was delayed or reordered because of problems with the Instrument GSE. The Instrument teams arrived the same day that the testing was to start, and when the GSE was hooked up, there were problems. The ensuing troubleshooting process caused delays in the start of testing. In some instances, the test procedure was reordered to workaround the problem. | |
| language | English | |
| title | NASA-LLIS-0482 | num |
| title | Lessons Learned - Test Delays Due to Late Set-up of Instrument Ground Support Equipment (GSE) | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1996 | |
| contenttype | fulltext | |
| subject keywords | Administration/Organization | |
| subject keywords | Policy & Planning | |
| subject keywords | Test & Verification |

درباره ما