• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0522

Lessons Learned – Consider Stress Combinations During Design Analysis, also, do not Tap and Thread Acrylic Materials that will be Under Load

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1994

Abstract: Description of Driving Event:
On 5-2-85, a mishap occurred at the water tunnel at Building 1234. While the tunnel was filled with water for leak checks, the test section door detached from the test section, resulting in 3500 gallons of water escaping the tunnel and the building. Significant damage resulted to the test section door, model support mechanism, test section, flow channel, and the honeycomb flow straighteners.
The cause of the accident was the prying action between the door and the adjacent wall. This prying action, which was not considered in the design analysis, created stresses in the lucite door material beyond its flexural strength. There were other errors in the door design, to include: stresses were not combined (however, in the analysis performed - prying action not included The material strength would have been sufficient for the loads considered). Acrylic materials should not be tapped and threaded (manufacturers recommend use of oversize bolt holes, grommets, and washers to minimize stress from through bolting) as was done with the test section door; and, framing, which could have provided for the load, was not used. The tunnel critical design review stipulated that, due to the effects of vibration, the water tunnel and the jet exit facility should not be run simultaneously. Effects of the jet exit facility vibrations on the water tunnel were not considered in the analysis.
URI: https://yse.yabesh.ir/std/handle/yse/39490
Subject: Hardware
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.48Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0522

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:37:37Z
date available2017-09-04T15:37:37Z
date copyright08/12/1994
date issued1994
identifier otherAZBEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/39490
description abstractDescription of Driving Event:
On 5-2-85, a mishap occurred at the water tunnel at Building 1234. While the tunnel was filled with water for leak checks, the test section door detached from the test section, resulting in 3500 gallons of water escaping the tunnel and the building. Significant damage resulted to the test section door, model support mechanism, test section, flow channel, and the honeycomb flow straighteners.
The cause of the accident was the prying action between the door and the adjacent wall. This prying action, which was not considered in the design analysis, created stresses in the lucite door material beyond its flexural strength. There were other errors in the door design, to include: stresses were not combined (however, in the analysis performed - prying action not included The material strength would have been sufficient for the loads considered). Acrylic materials should not be tapped and threaded (manufacturers recommend use of oversize bolt holes, grommets, and washers to minimize stress from through bolting) as was done with the test section door; and, framing, which could have provided for the load, was not used. The tunnel critical design review stipulated that, due to the effects of vibration, the water tunnel and the jet exit facility should not be run simultaneously. Effects of the jet exit facility vibrations on the water tunnel were not considered in the analysis.
languageEnglish
titleNASA-LLIS-0522num
titleLessons Learned – Consider Stress Combinations During Design Analysis, also, do not Tap and Thread Acrylic Materials that will be Under Loaden
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1994
contenttypefulltext
subject keywordsHardware
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian