NASA-LLIS-0131
Lessons Learned - Environmental Control System (ECS) Pressure Distribution Unit
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:38:02Z | |
| date available | 2017-09-04T15:38:02Z | |
| date copyright | 09/24/1992 | |
| date issued | 1992 | |
| identifier other | OWYCQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/40062 | |
| description abstract | Description of Driving Event: The environmental control system (ECS) pressure distribution unit pre-operations set-up requires several flexhose connections and leak checks prior to operation. Pressure lines could be misconnected and result in damage to flight hardware or injury to personnel. | |
| language | English | |
| title | NASA-LLIS-0131 | num |
| title | Lessons Learned - Environmental Control System (ECS) Pressure Distribution Unit | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1992 | |
| contenttype | fulltext | |
| subject keywords | Configuration Management | |
| subject keywords | Ground Equipment | |
| subject keywords | Ground Operations | |
| subject keywords | Hardware |